Saturday, 27 October 2012

No posts for a while but things have been happening on the floathouse and lots more imminent. Insulation, reclaimed maple flooring, metal stud framing, recycled plasterboard walls and lining, beds  all done. Thousand litre rainwater tank in place. Next: wood pellet boiler, solar thermal panels, composting toilet and water saving shower (all here and ready to be installed). Services planned and specified after endless internet trawling and discussion. Pumps and sumps on their way. Time for another big push.